FMEA - 2.2.0

New structure of the AIAG & VDA FMEA 

From this version onwards, the new structure screen for the AIAG & VDA FMEA is available to be used.

This change has improved the user experience when drafting the FMEA, and it has met requirements from the new version of the manual.

 

Filters in the AIAG & VDA FMEA structure 

From this version onwards, it is possible to filter records in the AIAG & VDA FMEA structure, in the function analysis and failure, risk, and optimization analysis steps.

This feature allows the user to find specific data in the structure.

 

Documentation of risk evaluation criteria in the AIAG & VDA FMEA

From this version onwards, it is possible to view the severity, occurrence, and detection indexes, and the action priority (AP) directly on the structure screen.

This feature gives practicality to the team drafting the FMEA.

 

History in the AIAG & VDA FMEA

From this version onwards, it will be possible to view the change history in the AIAG & VDA FMEA.

This feature allows the user to view the record change events, ensuring greater transparency and traceability when drafting the FMEA.

Learn more about these new features:

 

Integration of SoftExpert Action Plan with AIAG & VDA FMEA

From this version onwards, it is possible to have an integration between AIAG & VDA FMEAs and Action plans.

This feature allows the user to manage actions used in the FMEA while using resources from the SoftExpert Action Plan component.

 

Export and import the AIAG & VDA FMEA structure to a spreadsheet

From this version onwards, it is possible to export the AIAG & VDA FMEA structure to a spreadsheet and import the edited data to the system.

This feature allows the user to draft the FMEA while offline.

 

Actions required in the AIAG & VDA FMEA structure

From this version onwards, it is possible to require recommended actions in the AIAG & VDA FMEA structure according to rules configured in the FMEA type.

This feature allows the user to mitigate human errors, making the FMEA more consistent.

 

Failure controls required in the AIAG & VDA FMEA structure

From this version onwards, it is possible to require controls in the AIAG & VDA FMEA structure according to rules configured in the FMEA type.

This feature allows the user to mitigate human errors, making the FMEA more consistent.

 

Control import in the FMEA

From this version onwards, it will be possible to import controls via spreadsheet or by using the SOAP technology.

This feature allows the user to import large numbers of records into the system. For more information on this feature, refer to the Integration guide.

 

Special characteristic rule sorting in the FMEA type

From this version onwards, it is possible to change the order of the symbol rules in the FMEA type.

This feature allows the users to control which symbol will be applied if more than one rule is met.

 