Finishing a risk and control plan audit

Contact icon with blue background, leading to the initial step of the flow, where auditors are registered.	Gear icon with blue background, leading to the second step of the flow, where the audit is configured.	Gear icon with blue background, leading to the third step of the flow, where the plan is configured.
Fill-in icon with blue background, leading to the fourth step of the flow, where the audit is planned.	Completion icon with blue background, leading to the fifth step of the flow, where the audit is executed.

This article is valid for the new Audit (AU001) unified menu in system version 3.0.

  • Access the release notes for further details about the significant changes in the unification of the menu.
  • Click here to access the documentation valid for the old audit execution menu.
 

 

Prerequisites

 

Introduction

After evaluating all the objects associated in the audit scope structure, it is possible to finish the risk and control plan audit.

See how to perform this operation:

 

Finishing a risk and control plan audit

1. Access the Audit (AU001) menu or the Task center > Audit > Audit execution menu.

2. Locate the category and right-click on it.

3. Select the Open data option. The Audit data screen will be displayed.

The "Audit data" screen is open in the General data section.

4. Use the options available on the screen to complement the data, view the history, and issue reports for the audit:

Comment

In this tab, it is possible to add comments about the audit. 

It is available in all the steps configured for the audit and allows the responsible parties to interact and share information in a practical and quick manner.

The "Audit data" screen is open in the Comment section.
 
 

Attachment

In this tab, it is possible to upload files, add HTTP or network addresses, enter a physical file, and capture images.

 
 

History

In this tab, it is possible to view the history of the steps through which the audit has gone.

It allows for tracking how much time the audit stayed in each one of the steps, in addition to showing the cases in which the audit had to return to previous steps for data correction.

The "Audit data" screen is open in the History section.
 
 

Associations

In this tab, it is possible to associate existing objects from the Document, Kanban, Survey, and Meeting components.

 
 

Report

By clicking on this section, it is possible to generate reports for the audit being executed.

The "Generate report" screen is open, with the fields completed.
 
 

5. Access the General data tab.

6. In Execution, fill in the Actual end date field.

7. Click on the Send to next step button and confirm the operation.

User following the steps described above to finalize the audit.

 

Conclusion

According to the configurations applied to the category, after the audit is executed, it may go through the closure step or be finished automatically.